Cooling tower structure with access stairs and platform railings

Cooling Tower Support Frames

Pultruded GFRP structural frames for humid, chemically exposed cooling-tower environments.

Cooling Tower Support Frames. Designed around the application.

Water-treatment chemicals, persistent moisture and vapour can make steel-frame maintenance demanding. Dingchang assembles cooling-tower frames from pultruded GFRP columns, beams and braces, with project-specific connections for new equipment or replacement of existing steel frames.

Tower columns, beams, bracing and connections form a single structural system. Equipment interfaces and the load path should be established before individual sections are selected, with the water-treatment chemistry and vapour conditions reviewed alongside the required mechanical properties.

Where this solution fits.

  • Chemical and petrochemical facilities
  • Power and metallurgy cooling systems
  • Pharmaceutical plants and tower refurbishment
Advantages
Resistant to acid, alkali and salt corrosion. Unaffected by circulating cooling water and water vapor, no rusting over long service life, perfectly suited for the highly humid and corrosive working conditions of cooling towers.
Lightweight yet high strength. Much lighter than steel structures, it reduces the overall load of cooling towers, facilitating transportation and on-site assembly to shorten construction time.
Electrically insulating with no conduction risk. Free from galvanic corrosion and prevents component damage caused by stray current.
UV-resistant and anti-aging. Its performance degrades slowly under long-term outdoor exposure. No painting or anti-corrosion coating required, greatly cutting later maintenance expenses.
Dimensional stability with high pultrusion accuracy and consistent profile quality, ideal for standardized modular assembly of cooling towers.
Low thermal conductivity with outstanding heat insulation, minimizing cooling loss and improving cooling efficiency.

A coordinated component system.

The layout, material and connections are reviewed together before production.

01

Corrosion-focused selection

Resin and reinforcement reviewed against water treatment and operating conditions.

02

Lower component weight

Pultruded sections reduce handling weight compared with conventional steel members.

03

Bolted assembly

Prefabricated members reduce the need for welding during site assembly.

Cooling Tower Support Frames

Watch the product and application video.

Watch on YouTube ↗

From project inputs to component supply.

01

Review the application.

Share drawings, operating conditions and the intended function. We review the layout, supporting structure, loads and connection interfaces together with the proposed component scope.

02

Agree the specification.

Confirm the material, section geometry, surface and manufacturing route. Tooling, samples and required tests are included in the development programme before the production specification is finalized.

03

Prepare for delivery.

Coordinate quantities, component preparation, module sizes and packing around the project destination. Installation information and inspection requirements form part of the agreed supply scope.

Frequently asked questions.

Can an existing steel support frame be replaced?

Replacement work requires the original structure, equipment loads, connection details and available installation space to be reviewed. The GFRP member arrangement is developed around those inputs rather than copied directly from steel section dimensions.

Which exposure details are needed for resin selection?

Share the circulating-water chemistry, treatment products, operating temperature, pH and expected vapour exposure. These inputs help define the resin system and the validation information needed for the selected frame.

What should I send for a quotation?

Please share your cooling tower support frames layout or component drawings, dimensions, quantities and delivery destination. Include the operating conditions, attachment interfaces, material or finish preferences and any inspection requirements.

Can dimensions and surface finishes be customized?

Dimensions, tolerances, colour, surface texture and prepared connection features can be reviewed for the selected product and manufacturing process. A drawing and sample review help establish the agreed acceptance criteria.

Can you coordinate components as a complete project supply?

Profiles, panels, molded parts and matching fittings can be considered together. The quotation should identify the assembly scope, component preparation, packing method and the information needed for installation.

What determines the production schedule?

Tooling, material selection, quantity, sample approval and the agreed inspection scope influence the programme. Share your required delivery date at the enquiry stage so that the development and production steps can be reviewed.

Talk to Dingchang

Let’s build your next project.

Share your application, drawings and requirements. Our team will help you develop the right composite solution.

Shandong Dingchang Composite Materials Co., Ltd.

WhatsApp +86 17515190958
Address

Wucheng High-tech Industrial Park, Sinvsi Town,
Wucheng County, Dezhou, Shandong, China

Tell us about your project

Send your requirements using the form below.

官网询盘